Categories

Site Information

Bushings (MPT x FPT)

When a CPVC system requires that a different diameter of pipe be attached, schedule 80 CPVC bushings are just what you need. One of the benefits of these fittings is that they can come with different ends. The MPT x FPT bushings have one end that is male threaded and another end that is female threaded. Fittings with threaded ends are capable of ensuring a tight seal without having to use additional adhesives.
Read more about this category...

More about Schedule 80 CPVC MPT x FPT Bushings...

While bushings and couplings obtain similiar goals in a system, the main difference is that bushings usually have threaded ends, and couplings usually have slip ends. Although both come in threaded and slip ends, bushings offer a wider selection of threaded ends, and couplings offer a wider selection of slip ends.

Schedule 80 CPVC bushings have two main benefits over other styles of bushings. First, since they are schedule 80, they can handle very high pressures. Second, their CPVC construction ensures that they can handle extreme temperatures as well.

Key features of schedule 80 CPVC MPT x FPT bushings:

  • Durable schedule 80 CPVC construction
  • Ability to handle higher pressures
  • Ability to handle temperatures up to 210⁰ F
  • Available in a wide range of sizes

Checkout our selection of schedule 80 CPVC MPT x FPT bushings now!